Code library
Upload the zoning ordinance, design guidelines, and fee schedules. Tag each by document type so the right source gets cited.
For city managers & planning departments
Redflag answers zoning, building code, and permitting questions for developers before they reach your counter. The city workspace lets your staff keep that answer correct: upload code documents, connect your ArcGIS layers, and see every question asked about your jurisdiction.
Sample results from a demo workspace. Live search runs against ArcGIS Online.
The city workspace
Each tab maps to something your department already manages. Staff edit it once and every applicant report uses it.
Upload the zoning ordinance, design guidelines, and fee schedules. Tag each by document type so the right source gets cited.
Search ArcGIS Online or paste your server root, like gis.city.gov/arcgis/rest/services. Browse folders and layers, then add any layer in one click.
See every zoning, overlay, flood, and parcel layer feeding your reports. Fix a field mapping or retire an outdated service yourself.
Ask the question an applicant would. See the answer Redflag gives and the exact sections it cites, before anyone else does.
Keep planners, building officials, and fire marshals current, so requests for information reach the right desk.
Every question sent to your staff in one list, with the project address, each question, and your reply.
Onboarding
We create the workspace with the data Redflag already has for your jurisdiction.
Search for your public map services and add the zoning, overlay, and parcel layers.
Upload current ordinances and amendments. Older versions stay on record.
Run your counter's common questions and confirm every citation.
Fewer counter visits
When the code doesn’t settle it, the question comes to your inbox with the full project context.
Illustrative questions and staff replies; citations open real Hemet source documents.
What is the minimum front setback in Hemet's single-family zones?
20 feet in most single-family zones, and 18 feet in the smaller-lot zones Minimum front yard setbackHemet Municipal Code · Article XI. Single-Family Residential Zones · p. 84. Minimum front yard setback (linear ft.) — a. Minimum except as provided for in b and c: 20 · 20 · 20 · 20 · 18 · 18 · 18Open cited page ↗. Eaves, bay windows and similar features may project up to 30 inches into the front setback Projections into setbacksHemet Municipal Code · Article XI. Single-Family Residential Zones · p. 10Projecting Feature: Cornices, eaves, roof overhangs, brackets, bay windows and similar features — Front Setback Area: 30 inchesOpen cited page ↗.
Q1. The land use matrix lists a bank with drive-through as conditional Sec. 90-1423(B)(22)Hemet Municipal Code · Article XXVI. Commercial Zones · p. 53. Bank — a. With drive-through: C (conditionally permitted) in each commercial zone · Sec. 90-1423(B)(22)Open cited page ↗. Does the same CUP path apply to drive-through retail?
Q1. The building sits in a flood hazard area. Does a $180k interior remodel count as substantial improvement?
The building official makes that determination at plan check [A] 104.2.1 Substantial improvementHemet Municipal Code · Chapter 14 - Buildings and Building Regulations · p. 6For applications for reconstruction, rehabilitation, repair, alteration, addition or other improvement of existing buildings or structures located in flood hazard areas, the building official shall determine if the proposed work constitutes substantial improvement…Open cited page ↗. Submit a cost estimate and the assessed structure value with your permit. — Building & Safety
Q2. When are sewer connection fees due, and where is the schedule?
Before the connection is made Sec. 82-41 Connection feesHemet Municipal Code · Chapter 82 - Utilities · p. 3There shall be paid to the city fees for connection to the city sewer system prior to any connection being made. The amount of such fees shall be set from time to time by the council, and a schedule of such fees is on file in the city clerk's office.Open cited page ↗. The current schedule is set by council and on file with the City Clerk. — Public Works
Q3. The parcel is partly in FEMA Zone AE. Can we get a modification to the flood requirements?
Only with a showing of good and sufficient cause tied to the lot's unique characteristics [A] 104.10.1 Flood hazard areasHemet Municipal Code · Chapter 14 - Buildings and Building Regulations · p. 7The building official shall not grant modifications to any provision required in flood hazard areas… unless a determination has been made that: 1. A showing of good and sufficient cause that the unique characteristics of the size, configuration or…Open cited page ↗. — Building & Safety
Illustrative outcomes
Target reduction in repeat zoning questions at the counter.
Each code change entered once, reflected in every report.
Answers cite the ordinance section they rely on.
Book a 30-minute walkthrough. We'll load your jurisdiction beforehand so you see your own codes and maps.